Long Motor Leads on a VFD: What to Check

Once the cable from a TECO drive to the motor runs past 82 ft (25 m), lower the carrier frequency to the TECO table. On longer runs, check that the motor meets NEMA MG 1 Part 31, use symmetrical shielded VFD cable, and add a load reactor at the drive output. Long leads act like a transmission line. Each fast drive pulse can bounce back and stack at the motor, up to about twice the voltage. That spike is what punches through motor insulation.

Request a QuoteBook 30 Minutes to Review the ApplicationCall 248-830-4850

Step 1: set the carrier frequency to the cable length

Cable length, drive to motor Under 100 ft (30 m) 100 to 165 ft (30 to 50 m) 166 to 328 ft (50 to 100 m) Over 329 ft (100 m)
Max carrier frequency (parameter 11-01) 16 kHz 10 kHz 5 kHz 2 kHz

Step 2: check the motor insulation

NEMA MG 1 Part 31 sets the peak voltage an inverter duty motor (600 V and under) must take at its terminals, with a rise time of 0.1 µs or more.

Motor rated voltage Withstand peak (Part 31) Partial discharge free peak (Part 31)
230 V 716 V 513 V
460 V 1,431 V 1,025 V
575 V 1,789 V 1,281 V

TECO Westinghouse states its small VFD duty motors meet or exceed the Part 31 voltage levels. The MAX-E1 uses inverter duty magnet wire rated for spikes up to 2,200 V. The MAX-E2/841 is rated for inverter use per Part 31 at 20:1 variable torque and 10:1 constant torque (3:1 constant torque at 350 HP and up). See TECO Westinghouse motors.

Step 3: pick the cable, the reactor and the bearing fix

Item What the maker says On this site
VFD cable TECO motor group best method: symmetrical 3 phase cable, 3 ground conductors grounded in both boxes, 100% coverage shield grounded at the glands Tekima 365S-3XG (3C + 3 grounds, shielded, UL TC-ER 600/1000 V), Tekima 365S-1XG
Load reactor Rex: a reactor alone on the drive output cuts long cable spikes from about 200% to typically under 150%, and cuts cable charging current of 10 to 20 A that trips small drives. Mount it next to the drive Rex 3PR line/load reactors, Rex collection
Motor guarding filter Rex: reactor plus resistors cuts peaks to under 125% Quoted to order from Rex
Wire size TECO: size input and motor wire for 2% voltage drop or less Ask us for the drop on your run
Bearings, frames under 320 TECO motor group: shaft ground brush, or CoolBlue inductive absorbers Specify with the motor
Bearings, 320 to 440 frames 1 insulated bearing at the non drive end plus a drive end ground brush, or CoolBlue absorbers Specify with the motor
Bearings, 444/449 frames and up 2 insulated bearings plus a drive end ground brush, or CoolBlue absorbers Specify with the motor

Worked example: 25 HP, 460 V motor, 300 ft from a 480 V drive

Step Math or rule Result
Carrier frequency 300 ft is in the 166 to 328 ft band 5 kHz max on parameter 11-01
DC bus 480 V × 1.35 About 650 V DC
Worst spike at the motor, no reactor About 2 × the bus on a long cable About 1,300 V, close to the 1,431 V Part 31 withstand and over the 1,025 V partial discharge free level
With a load reactor Rex: typically under 150% Under about 975 V, below the 1,025 V partial discharge free level
Reactor size Rex 480 V table: 25 HP is a 34 A reactor Rex 3PR-0034C3H at the drive output
Cable Symmetrical, 3 grounds, shielded Tekima 365S-3XG, sized for 2% drop or less

Common questions

Can I put capacitors or an LC filter on the drive output?

No. The TECO manuals say do not connect power factor capacitors or LC/RC noise filters to the drive output. NEMA MG 1 Part 31 also says power capacitors on the load side of an inverter are not recommended. Use a load reactor or a motor guarding filter made for drive output.

Why does my drive trip on overcurrent with a long cable?

Cable capacitance draws charging current on every pulse. Rex puts it at 10 to 20 A on long runs, enough to trip a small drive. Lower the carrier frequency first, then add a load reactor.

Is a load reactor the same part as a line reactor?

Often, yes. Rex 3PR reactors are rated for the drive input or output. Where it goes sets the job. See line reactor vs load reactor.

Does shielded VFD cable alone stop the spikes?

No. Good cable gives the high frequency current a clean path back to the drive and helps protect bearings. The spike at the motor is set by cable length, rise time and carrier frequency. A reactor or filter at the drive output cuts it.

What about bearing damage?

The drive puts a common mode voltage on the motor shaft. TECO motor group says to check shaft voltage and fit a ground brush, insulated bearings or inductive absorbers by frame size, as in the table above.

Get the package sized and quoted

Send the motor HP and voltage, the drive model, the cable length and how the cable is run. We send back the TECO drive and motor, the Rex reactor and the Tekima cable as one quote.

Request a QuoteBook 30 Minutes to Review the ApplicationCall 248-830-4850

Related: Line reactor vs load reactor · TECO AC drives · TECO motors · VFD cable cross reference · Rex Power Magnetics · All cross references